Bioenergy / Waste

Longannet

West Fife, Fife

Longannet is a 25 MW bioenergy / waste project in Scotland. The applicant or operator on record is Scottish Power Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 07/01283/WEIA.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedAug 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-01-11.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

25.000 MW
Registered Capacity

πŸ“‹ Project Overview

Longannet is a 25 MW bioenergy / waste project in Scotland. The applicant or operator on record is Scottish Power Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 07/01283/WEIA.

πŸ”§ Technical Specifications

Capacity (MW)25.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperScottish Power Renewables
Owner / operatorScottish Power Renewables
Year consented2008
LocationWest Fife, Fife
RegionScotland
Coordinates56.0573989Β°N, 3.7038561Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2007-04-16
2008-08-22