π Project Overview
Long Barrow Solar Farm Project is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Low Carbon Solar Park 42 Limited. The scheme is currently in the planning system, submitted July 2025. The determining authority is East Cambridgeshire, reference 25/00770/ESF.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 49.900 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Low Carbon Solar Park 42 Limited |
| Owner / operator | Low Carbon Solar Park 42 Limited |
| Location | N/O New England Farm, Heath Road, Swaffham Bulbeck, Cambridge, Cambridgeshire, CB25 |
| Region | Eastern |
| Coordinates | 52.2781327Β°N, 0.3293666Β°E |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Ground |
| Solar Site Area (sqm) | 808000 |