Land To The South Of B570, Gipsy Lane, Irchester, Wellingborough,, Northamptonshire, NN29 7UF
London Road, Irchester - Solar Farm is a 26 MW solar farm project in East Midlands. The applicant or operator on record is Atrato Onsite Energy. It is recorded as operational. The determining authority is North Northamptonshire, reference NW/22/00353/FUL.β¦
Operational
Project stageOperating
PlanningMay 2022 (completed)
ConsentedNov 2022 (completed)
ConstructionApr 2023 (completed)
Operating (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2024-02-13.
Registered planning capacity; not measured generation.
London Road, Irchester - Solar Farm is a 26 MW solar farm project in East Midlands. The applicant or operator on record is Atrato Onsite Energy. It is recorded as operational. The determining authority is North Northamptonshire, reference NW/22/00353/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
26.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Atrato Onsite Energy
Owner / operator
Atrato Onsite Energy
Year consented
2022
Construction started
2023
Location
Land To The South Of B570, Gipsy Lane, Irchester, Wellingborough,, Northamptonshire, NN29 7UF