Adj A131 London Road, Great Notley, Braintree, Essex, CM77 7UW
London Road, Great Notley - Micro Energy Storage is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Braintree, reference 25/01100/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMay 2025 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-11-07.
Registered planning capacity; not measured generation.
London Road, Great Notley - Micro Energy Storage is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Braintree, reference 25/01100/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Clean Energy
Owner / operator
AMP Clean Energy
Location
Adj A131 London Road, Great Notley, Braintree, Essex, CM77 7UW