Logierieve Farm, Udny - Solar Array is a 0.25 MW solar farm project in Scotland. The applicant or operator on record is Roderic Bruce. The scheme is currently in the planning system, submitted September 2025. The determining authority is Aberdeenshire, reference APP/2025/1379.…

In Planning
Project stageIn planning
  1. PlanningSep 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-10-31.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.250 MW
Registered Capacity

πŸ“‹ Project Overview

Logierieve Farm, Udny - Solar Array is a 0.25 MW solar farm project in Scotland. The applicant or operator on record is Roderic Bruce. The scheme is currently in the planning system, submitted September 2025. The determining authority is Aberdeenshire, reference APP/2025/1379.

Site Schematic

SUBSTATION ? ha Β· 0.25 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.250 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRoderic Bruce
Owner / operatorRoderic Bruce
LocationE/O Logierieve Farm, Udny, Ellon, Aberdeenshire, AB41 6PT
RegionScotland
Coordinates57.3311472Β°N, 2.129732Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID19749
Mounting Type for SolarGround
Are they re-applying (Old REPD Ref) 17056

πŸ“… Project Timeline