Logie Newton Wind Farm

Land At Hassiewells, Rothienorman, Inverurie, Grampian, Aberdeenshire, AB51 8XX

Logie Newton Wind Farm is a 1.6 MW onshore wind project in Scotland. The applicant or operator on record is Muirden Energy. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2015/2658.…

Refused
Project stageRefused
  1. PlanningAug 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2017-04-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.600 MW
Registered Capacity

πŸ“‹ Project Overview

Logie Newton Wind Farm is a 1.6 MW onshore wind project in Scotland. The applicant or operator on record is Muirden Energy. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2015/2658.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMuirden Energy
Owner / operatorMuirden Energy
LocationLand At Hassiewells, Rothienorman, Inverurie, Grampian, Aberdeenshire, AB51 8XX
RegionScotland
Coordinates57.4566207Β°N, 2.5670204Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)0.8
No. of Turbines2
Height of Turbines (m)80

πŸ“… Project Timeline

2015-08-27