Lockmeadow Centre, Barker Road, Maidstone, Kent, ME16 8SF
Lockmeadow Centre, Barker Road - Solar Panels is a 0.39 MW solar farm project in South East. The applicant or operator on record is Maidstone Borough Council. The application has been withdrawn or the scheme abandoned. The determining authority is Maidstone, reference 25/502531/Pβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2025 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-11-10.
Registered planning capacity; not measured generation.
Lockmeadow Centre, Barker Road - Solar Panels is a 0.39 MW solar farm project in South East. The applicant or operator on record is Maidstone Borough Council. The application has been withdrawn or the scheme abandoned. The determining authority is Maidstone, reference 25/502531/PN14J.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.390 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Maidstone Borough Council
Owner / operator
Maidstone Borough Council
Location
Lockmeadow Centre, Barker Road, Maidstone, Kent, ME16 8SF