π Project Overview
Lockleaze Energy Storage is a 15 MW battery storage project in South West. The applicant or operator on record is Aura Power. It is recorded as operational since December 2017. The determining authority is Bristol, City of, reference 17/01147/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 15 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Aura Power |
| Owner / operator | Aura Power |
| Construction started | 2017 |
| Commissioned / target | 2017 |
| Location | Land at the SWEB Estate, Romney Avenue, Lockleaze, Bristol, Avon, BS7 9ST |
| Region | South West |
| Coordinates | 51.4849134Β°N, 2.5716459Β°W |