Lock Street Energy from Waste Plant is a 10.6 MW bioenergy / waste project in North West. The applicant or operator on record is WASTE TO ENERGY (NW). The planning application was refused. The determining authority is St. Helens, reference P/2013/0475.…

Refused
Project stageRefused
  1. PlanningJun 2013 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2014-05-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.600 MW
Registered Capacity

πŸ“‹ Project Overview

Lock Street Energy from Waste Plant is a 10.6 MW bioenergy / waste project in North West. The applicant or operator on record is WASTE TO ENERGY (NW). The planning application was refused. The determining authority is St. Helens, reference P/2013/0475.

πŸ”§ Technical Specifications

Capacity (MW)10.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWASTE TO ENERGY (NW)
Owner / operatorWASTE TO ENERGY (NW)
LocationRavenhead Glass Warehouse, Lock Street, St Helens,, Merseyside
RegionNorth West
Coordinates53.4600993Β°N, 2.7269152Β°W

Additional published register fields

Registered technologyEfW Incineration
Are they re-applying (Old REPD Ref) 879

πŸ“… Project Timeline

2013-06-21