πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Lochhead Steading Concrete Block Manufacturing Plant

Lochhead Steading, Forfar, Tayside, Angus, DD8 2RL

Lochhead Steading Concrete Block Manufacturing Plant is a 0.23 MW solar farm project in Scotland. The applicant or operator on record is Laird Brothers. Planning permission has been granted as of November 2019 and it is awaiting construction. The determining authority is Angus, r…

Consented / Approved
Project stageConsented
  1. PlanningSep 2019 (completed)
  2. ConsentedNov 2019 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2019-10-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.230 MW
Registered Capacity

πŸ“‹ Project Overview

Lochhead Steading Concrete Block Manufacturing Plant is a 0.23 MW solar farm project in Scotland. The applicant or operator on record is Laird Brothers. Planning permission has been granted as of November 2019 and it is awaiting construction. The determining authority is Angus, reference 19/00712/FULL.

Site Schematic

SUBSTATION ? ha Β· 0.23 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.230 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLaird Brothers
Owner / operatorLaird Brothers
Year consented2019
LocationLochhead Steading, Forfar, Tayside, Angus, DD8 2RL
RegionScotland
Coordinates56.6473201Β°N, 2.857694Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2019-09-27
2019-11-05