Leanachan Forest, Torlundy, Fort William, Highlands, Highland, PH33 6S
Lochaber Hydro Development (Scheme 5) is a 1.6 MW conventional hydro project in Scotland. The applicant or operator on record is Simec Lochaber Hydropower 2. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 18/04648/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2018 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2019-09-27.
Registered planning capacity; not measured generation.
Lochaber Hydro Development (Scheme 5) is a 1.6 MW conventional hydro project in Scotland. The applicant or operator on record is Simec Lochaber Hydropower 2. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference 18/04648/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Simec Lochaber Hydropower 2
Owner / operator
Simec Lochaber Hydropower 2
Location
Leanachan Forest, Torlundy, Fort William, Highlands, Highland, PH33 6S