Loch Doon Dam U759 Loch Doon, Dalmellington, From A713 At Mossdale To, Ayr, Strathclyde, East Ayrshire, KA6 7SJ

Loch Doon Dam Compensation Set is a 0.3 MW conventional hydro project in Scotland. The applicant or operator on record is Drax (formerly Scottish Power). Planning permission has been granted as of May 2019 and it is awaiting construction. The determining authority is East Ayrshir…

Consented / Approved
0 MW
Installed Capacity

πŸ“‹ Project Overview

Loch Doon Dam Compensation Set is a 0.3 MW conventional hydro project in Scotland. The applicant or operator on record is Drax (formerly Scottish Power). Planning permission has been granted as of May 2019 and it is awaiting construction. The determining authority is East Ayrshire, reference 18/0922/LB.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 0 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDrax (formerly Scottish Power)
Owner / operatorDrax (formerly Scottish Power)
Year consented2019
LocationLoch Doon Dam U759 Loch Doon, Dalmellington, From A713 At Mossdale To, Ayr, Strathclyde, East Ayrshire, KA6 7SJ
RegionScotland
Coordinates55.2847982Β°N, 4.3988058Β°W

πŸ“… Project Timeline