πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Liverpool John Lennon Airport - Solar Farm

Liverpool John Lennon Airport, Dungeon Lane, Hale Road & Baileys Lane To The E/O Liverpool John Lennon Airport Speke, Liverpool, Merseyside, L24 5RH

Liverpool John Lennon Airport - Solar Farm is a 3 MW solar farm project in North West. The applicant or operator on record is Liverpool Airport Limited. The planning application was refused. The determining authority is Halton, reference 22/00019/PLD.…

Refused
Project stageRefused
  1. PlanningDec 2021 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2022-01-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.000 MW
Registered Capacity

πŸ“‹ Project Overview

Liverpool John Lennon Airport - Solar Farm is a 3 MW solar farm project in North West. The applicant or operator on record is Liverpool Airport Limited. The planning application was refused. The determining authority is Halton, reference 22/00019/PLD.

Site Schematic

SUBSTATION ? ha Β· 3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)3.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLiverpool Airport Limited
Owner / operatorLiverpool Airport Limited
LocationLiverpool John Lennon Airport, Dungeon Lane, Hale Road & Baileys Lane To The E/O Liverpool John Lennon Airport Speke, Liverpool, Merseyside, L24 5RH
RegionNorth West
Coordinates53.3370069Β°N, 2.8302309Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround

πŸ“… Project Timeline

2021-12-24