Park Lane, Pitney, Langport, Somerset, Somerset, TA10 9AU
Little Park Farm is a 8.6 MW solar farm project in South West. The applicant or operator on record is Solar Power Generation Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Somerset, reference 12/04673/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2012 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2013-02-22.
Registered planning capacity; not measured generation.
Little Park Farm is a 8.6 MW solar farm project in South West. The applicant or operator on record is Solar Power Generation Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Somerset, reference 12/04673/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
8.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Solar Power Generation Ltd
Owner / operator
Solar Power Generation Ltd
Location
Park Lane, Pitney, Langport, Somerset, Somerset, TA10 9AU