Lisnamuck Wind Farm is a 6 MW onshore wind project in Northern Ireland. The applicant or operator on record is Lisnamuck Wind Farm Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Causeway Coast and Glens, reference C/2008/0163/F.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningFeb 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2011-04-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.000 MW
Registered Capacity

πŸ“‹ Project Overview

Lisnamuck Wind Farm is a 6 MW onshore wind project in Northern Ireland. The applicant or operator on record is Lisnamuck Wind Farm Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Causeway Coast and Glens, reference C/2008/0163/F.

Site Schematic

NORTHERN IRELAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)6.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLisnamuck Wind Farm Limited
Owner / operatorLisnamuck Wind Farm Limited
LocationLand approximately 750m south of 13B Lisnamuck Road, Blackhill, Coleraine, Co. Derry / Londonderry
RegionNorthern Ireland
Coordinates55.0420405Β°N, 6.6549785Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines3

πŸ“… Project Timeline

2008-02-21