Lisnaharney Road Wind Farm is a 42 MW onshore wind project in Northern Ireland. The applicant or operator on record is ARC NI 3 Ltd/Windyfields (Renewable Energy International). The planning application was refused. The determining authority is Fermanagh and Omagh, reference K/20β¦
Refused
Project stageRefused
PlanningApr 2013 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2017-01-31.
Registered planning capacity; not measured generation.
Lisnaharney Road Wind Farm is a 42 MW onshore wind project in Northern Ireland. The applicant or operator on record is ARC NI 3 Ltd/Windyfields (Renewable Energy International). The planning application was refused. The determining authority is Fermanagh and Omagh, reference K/2013/0181/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
42.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
ARC NI 3 Ltd/Windyfields (Renewable Energy International)
Owner / operator
ARC NI 3 Ltd/Windyfields (Renewable Energy International)