Solar Farm

Linwood Farm, Linwood Lane - Solar Panels

Linwood Farm Linwood Lane, Cambridgeshire, PE15 0YG

Linwood Farm, Linwood Lane - Solar Panels is a 0.41 MW solar farm project in Eastern. The applicant or operator on record is BeBa Energy UK Limited. Planning permission has been granted as of February 2023 and it is awaiting construction. The determining authority is Fenland, ref…

Consented / Approved
0 MW
Installed Capacity

πŸ“‹ Project Overview

Linwood Farm, Linwood Lane - Solar Panels is a 0.41 MW solar farm project in Eastern. The applicant or operator on record is BeBa Energy UK Limited. Planning permission has been granted as of February 2023 and it is awaiting construction. The determining authority is Fenland, reference F/YR22/1375/PNSOL.

Site Schematic

SUBSTATION ? ha Β· 0.41 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBeBa Energy UK Limited
Owner / operatorBeBa Energy UK Limited
Year consented2023
LocationLinwood Farm Linwood Lane, Cambridgeshire, PE15 0YG
RegionEastern
Coordinates52.5236931Β°N, 0.0738079Β°E