Linroyal Potato Processing Plant Heckdyke, West Stockwith, South Yorkshire, DN10 4BE
Linroyal Potato Processing Plant, Heckdyke - Solar Panels is a 0.35 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Linroyal Potatoes Limited. Planning permission has been granted as of February 2023 and it is awaiting construction. The deterβ¦
Consented / Approved
Project stageConsented
PlanningJan 2023 (completed)
ConsentedFeb 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-03-02.
Registered planning capacity; not measured generation.
Linroyal Potato Processing Plant, Heckdyke - Solar Panels is a 0.35 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Linroyal Potatoes Limited. Planning permission has been granted as of February 2023 and it is awaiting construction. The determining authority is North Lincolnshire, reference 23/00016/PAN.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.350 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Linroyal Potatoes Limited
Owner / operator
Linroyal Potatoes Limited
Year consented
2023
Location
Linroyal Potato Processing Plant Heckdyke, West Stockwith, South Yorkshire, DN10 4BE