Lings Farm, Birkin Lane - Solar Panels is a 9 MW solar farm project in East Midlands. The applicant or operator on record is Fuse Renewables Limited. The scheme is currently in the planning system, submitted April 2026. The determining authority is North East Derbyshire, referenc…

In Planning
Project stageIn planning
  1. PlanningApr 2026 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2026-05-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.000 MW
Registered Capacity

πŸ“‹ Project Overview

Lings Farm, Birkin Lane - Solar Panels is a 9 MW solar farm project in East Midlands. The applicant or operator on record is Fuse Renewables Limited. The scheme is currently in the planning system, submitted April 2026. The determining authority is North East Derbyshire, reference 26/00260/MFL.

Site Schematic

SUBSTATION ? ha Β· 9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)9.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFuse Renewables Limited
Owner / operatorFuse Renewables Limited
LocationTo The Se/O Lings Farm, Birkin Lane, Temple Normanton, Chesterfield, Derbyshire, S42 5BP
RegionEast Midlands
Coordinates53.1997036Β°N, 1.3847979Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID19646
Mounting Type for SolarGround
Solar Site Area (sqm)186039

πŸ“… Project Timeline