Verge At Lincoln Road, Near Werrington Parkway, Peterborough, Cambridgeshire, PE4 6LQ
Lincoln Road - Energy Storage System is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of October 2025 and it is awaiting construction. The determining authority is Peterborough, refereβ¦
Consented / Approved
Project stageConsented
PlanningJul 2025 (completed)
ConsentedOct 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-11-10.
Registered planning capacity; not measured generation.
Lincoln Road - Energy Storage System is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of October 2025 and it is awaiting construction. The determining authority is Peterborough, reference 25/00841/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Clean Energy
Owner / operator
AMP Clean Energy
Year consented
2025
Location
Verge At Lincoln Road, Near Werrington Parkway, Peterborough, Cambridgeshire, PE4 6LQ