Limolands Farm Solar Array is a 5 MW solar farm project in South East. The applicant or operator on record is Locogen. The planning application was refused. The determining authority is New Forest, reference 14/00817.β¦
Refused
Project stageRefused
PlanningOct 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2016-04-04.
Registered planning capacity; not measured generation.
Limolands Farm Solar Array is a 5 MW solar farm project in South East. The applicant or operator on record is Locogen. The planning application was refused. The determining authority is New Forest, reference 14/00817.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.