Limolands Farm is a 5 MW solar farm project in South East. The applicant or operator on record is Locogen. The application has been withdrawn or the scheme abandoned. The determining authority is New Forest, reference 14/00470.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2014 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2014-09-19.
Registered planning capacity; not measured generation.
Limolands Farm is a 5 MW solar farm project in South East. The applicant or operator on record is Locogen. The application has been withdrawn or the scheme abandoned. The determining authority is New Forest, reference 14/00470.