π Project Overview
Leyland Trucks, Croston Road - Solar Array is a 1.2 MW solar farm project in North West. The applicant or operator on record is Leyland Trucks Limited. The scheme is currently in the planning system, submitted May 2026. The determining authority is South Ribble, reference 07/2026/00387/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1.200 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Leyland Trucks Limited |
| Owner / operator | Leyland Trucks Limited |
| Location | Leyland Trucks Limited Croston Road Farington Moss, Lancashire, PR26 6RH |
| Region | North West |
| Coordinates | 53.7172248Β°N, 2.6980517Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Ground |
| Solar Site Area (sqm) | 24384 |