Lewis Wind Farm (Barvas Moor) is a 652 MW onshore wind project in Scotland. The applicant or operator on record is Lewis WindPower (a joint venture between British Energy Renewables and AMEC WIND). The planning application was refused. The determining authority is Scottish Governβ¦
Refused
Project stageRefused
PlanningNov 2004 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2008-04-22.
Registered planning capacity; not measured generation.
Lewis Wind Farm (Barvas Moor) is a 652 MW onshore wind project in Scotland. The applicant or operator on record is Lewis WindPower (a joint venture between British Energy Renewables and AMEC WIND). The planning application was refused. The determining authority is Scottish Government (S36).
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
652.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lewis WindPower (a joint venture between British Energy Renewables and AMEC WIND)
Owner / operator
Lewis WindPower (a joint venture between British Energy Renewables and AMEC WIND)