Lees Packhouse, The Gault, Sutton, Cambridgeshire, CB6 2BG
Lees Packhouse, The Gault - Solar PV System is a 0.27 MW solar farm project in Eastern. The applicant or operator on record is BeBa Energy UK Limited. Planning permission has been granted as of June 2023 and it is awaiting construction. The determining authority is East Cambridgeβ¦
Consented / Approved
Project stageConsented
PlanningApr 2023 (completed)
ConsentedJun 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-06-15.
Registered planning capacity; not measured generation.
Lees Packhouse, The Gault - Solar PV System is a 0.27 MW solar farm project in Eastern. The applicant or operator on record is BeBa Energy UK Limited. Planning permission has been granted as of June 2023 and it is awaiting construction. The determining authority is East Cambridgeshire, reference 23/00465/SON.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.270 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
BeBa Energy UK Limited
Owner / operator
BeBa Energy UK Limited
Year consented
2023
Location