Solar Farm

Leeds West, Gelderd Lane - Solar Panels

Leeds West, Unit 1 Gelderd Lane Holbeck, West Yorkshire, LS12 6AL

Leeds West, Gelderd Lane - Solar Panels is a 0.77 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Footprint Zero. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Leeds, refe…

Consented / Approved
Project stageConsented
  1. PlanningFeb 2026 (completed)
  2. ConsentedApr 2026 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-05-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.770 MW
Registered Capacity

πŸ“‹ Project Overview

Leeds West, Gelderd Lane - Solar Panels is a 0.77 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Footprint Zero. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Leeds, reference 26/00729/DPD.

Site Schematic

SUBSTATION ? ha Β· 0.77 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.770 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFootprint Zero
Owner / operatorFootprint Zero
Year consented2026
LocationLeeds West, Unit 1 Gelderd Lane Holbeck, West Yorkshire, LS12 6AL
RegionYorkshire and Humber
Coordinates53.7827076Β°N, 1.5797463Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2026-02-10
2026-04-07