πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Leadenham Poultry Unit, Sleaford Road - Solar Panels

Leadenham Poultry Unit, Sleaford Road, Sleaford, Lincoln, Lincolnshire, LN5 0QY

Leadenham Poultry Unit, Sleaford Road - Solar Panels is a 0.3 MW solar farm project in East Midlands. The applicant or operator on record is Sutherland Farms Limited. The application has been withdrawn or the scheme abandoned. The determining authority is North Kesteven, referenc…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMar 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2024-05-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.300 MW
Registered Capacity

πŸ“‹ Project Overview

Leadenham Poultry Unit, Sleaford Road - Solar Panels is a 0.3 MW solar farm project in East Midlands. The applicant or operator on record is Sutherland Farms Limited. The application has been withdrawn or the scheme abandoned. The determining authority is North Kesteven, reference 24/0306/PNREN.

Site Schematic

SUBSTATION ? ha Β· 0.3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSutherland Farms Limited
Owner / operatorSutherland Farms Limited
LocationLeadenham Poultry Unit, Sleaford Road, Sleaford, Lincoln, Lincolnshire, LN5 0QY
RegionEast Midlands
Coordinates53.0690681Β°N, 0.6110742Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2024-03-06