Leadenham Poultry Unit, Sleaford Road, Sleaford, Lincoln, Lincolnshire, LN5 0QY
Leadenham Poultry Unit, Sleaford Road - Solar Panels is a 0.3 MW solar farm project in East Midlands. The applicant or operator on record is Sutherland Farms Limited. The application has been withdrawn or the scheme abandoned. The determining authority is North Kesteven, referencβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMar 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-05-03.
Registered planning capacity; not measured generation.
Leadenham Poultry Unit, Sleaford Road - Solar Panels is a 0.3 MW solar farm project in East Midlands. The applicant or operator on record is Sutherland Farms Limited. The application has been withdrawn or the scheme abandoned. The determining authority is North Kesteven, reference 24/0306/PNREN.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Sutherland Farms Limited
Owner / operator
Sutherland Farms Limited
Location
Leadenham Poultry Unit, Sleaford Road, Sleaford, Lincoln, Lincolnshire, LN5 0QY