Solar Farm

Langer Lane Solar Farm

E/O Langer Lane, Wingerworth, Chesterfield, Derbyshire, S42 6TS

Langer Lane Solar Farm is a 7.5 MW solar farm project in East Midlands. The applicant or operator on record is Ethical Power Development Limited. Planning permission has been granted as of April 2025 and it is awaiting construction. The determining authority is North East Derbysh…

Consented / Approved
Project stageConsented
  1. PlanningJul 2024 (completed)
  2. ConsentedApr 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-02-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

7.500 MW
Registered Capacity

πŸ“‹ Project Overview

Langer Lane Solar Farm is a 7.5 MW solar farm project in East Midlands. The applicant or operator on record is Ethical Power Development Limited. Planning permission has been granted as of April 2025 and it is awaiting construction. The determining authority is North East Derbyshire, reference 24/00506/MFL.

Site Schematic

SUBSTATION ? ha Β· 7.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)7.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEthical Power Development Limited
Owner / operatorEthical Power Development Limited
Year consented2025
LocationE/O Langer Lane, Wingerworth, Chesterfield, Derbyshire, S42 6TS
RegionEast Midlands
Coordinates53.2075745Β°N, 1.4406674Β°W

Additional published register fields

Registered technologySolar Photovoltaics
CfD Allocation RoundAR7a
CfD Capacity (MW)7.5
Mounting Type for SolarGround
Solar Site Area (sqm)98055.33

πŸ“… Project Timeline

2024-07-12
2025-04-17