π Project Overview
Lane South-East from Cowbridge is a 5 MW solar farm project in Wales. The applicant or operator on record is Solar Century. The planning application was refused. The determining authority is Vale of Glamorgan, reference 2015/00649/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 5.000 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Solar Century |
| Owner / operator | Solar Century |
| Location | The Farm, , St. Hilary, The Farm, lane South-East from, Cowbridge, South Glamorgan, Vale of Glamorgan, CF71 7DP |
| Region | Wales |
| Coordinates | 51.4499812Β°N, 3.4143443Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Ground |