Solar Farm

Land South of Shothanger Works

Land Near Shothanger Works, Shothanger Lane, Wootton St Lawrence, Basingstoke, Hampshire, Hampshire, RG23 8TH

Land South of Shothanger Works is a 3.5 MW solar farm project in South East. The applicant or operator on record is Solar Planning. The planning application was refused. The determining authority is Basingstoke and Deane, reference 15/01378/FUL.…

Refused
Project stageRefused
  1. PlanningJun 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2015-12-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.500 MW
Registered Capacity

πŸ“‹ Project Overview

Land South of Shothanger Works is a 3.5 MW solar farm project in South East. The applicant or operator on record is Solar Planning. The planning application was refused. The determining authority is Basingstoke and Deane, reference 15/01378/FUL.

Site Schematic

SUBSTATION ? ha Β· 3.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)3.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSolar Planning
Owner / operatorSolar Planning
LocationLand Near Shothanger Works, Shothanger Lane, Wootton St Lawrence, Basingstoke, Hampshire, Hampshire, RG23 8TH
RegionSouth East
Coordinates51.2851481Β°N, 1.1401725Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)86300

πŸ“… Project Timeline

2015-06-11