Land South of Melton Road, Burton On The Wolds, Leicestershire, Leicestershire, LE12 5TQ
Land South of Melton Rd is a 5 MW solar farm project in East Midlands. The applicant or operator on record is Epsilon Solar. The planning application was refused. The determining authority is Charnwood, reference P/14/2030/2.β¦
Refused
Project stageRefused
PlanningNov 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2014-11-17.
Registered planning capacity; not measured generation.
Land South of Melton Rd is a 5 MW solar farm project in East Midlands. The applicant or operator on record is Epsilon Solar. The planning application was refused. The determining authority is Charnwood, reference P/14/2030/2.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Epsilon Solar
Owner / operator
Epsilon Solar