πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Land South of Knock Lane

Land to the South of Knock Lane, Blisworth, Northamptonshire, NN7 3DA

Land South of Knock Lane is a 4 MW solar farm project in East Midlands. The applicant or operator on record is Solar Power Inc UK Services. The application has been withdrawn or the scheme abandoned. The determining authority is West Northamptonshire, reference S/2015/2492/MAF.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-12-22.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.000 MW
Registered Capacity

πŸ“‹ Project Overview

Land South of Knock Lane is a 4 MW solar farm project in East Midlands. The applicant or operator on record is Solar Power Inc UK Services. The application has been withdrawn or the scheme abandoned. The determining authority is West Northamptonshire, reference S/2015/2492/MAF.

Site Schematic

SUBSTATION ? ha Β· 4 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSolar Power Inc UK Services
Owner / operatorSolar Power Inc UK Services
Year consented2015
LocationLand to the South of Knock Lane, Blisworth, Northamptonshire, NN7 3DA
RegionEast Midlands
Coordinates52.165595Β°N, 0.9306979Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Are they re-applying (Old REPD Ref) 5282
Solar Site Area (sqm)111000

πŸ“… Project Timeline

2015-10-26
2015-12-17