Land South of Bury Road, Marchwood, Southampton, Hampshire, SO40 4UD
Land South of Bury Road is a 4 MW solar farm project in South East. The applicant or operator on record is Lightsource Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is New Forest, reference 15/11153.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2015 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedSep 2015 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2018-04-30.
Registered planning capacity; not measured generation.
Land South of Bury Road is a 4 MW solar farm project in South East. The applicant or operator on record is Lightsource Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is New Forest, reference 15/11153.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
4.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lightsource Renewable Energy
Owner / operator
Lightsource Renewable Energy
Year consented
2015