Land off Lon Pin, Llanbedrog - Solar Farm is a 4.99 MW solar farm project in Wales. The applicant or operator on record is Lon Pin Solar Limited. The planning application was refused. The determining authority is Gwynedd, reference C23/0338/38/LL.β¦
Refused
Project stageRefused
PlanningDec 2023 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-11-10.
Registered planning capacity; not measured generation.
Land off Lon Pin, Llanbedrog - Solar Farm is a 4.99 MW solar farm project in Wales. The applicant or operator on record is Lon Pin Solar Limited. The planning application was refused. The determining authority is Gwynedd, reference C23/0338/38/LL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.