Solar Farm

Land off Lon Pin, Llanbedrog - Solar Farm

Adj Lon Pin, Llanbedrog, Pwllheli, Gwynedd, LL53 7PH

Land off Lon Pin, Llanbedrog - Solar Farm is a 4.99 MW solar farm project in Wales. The applicant or operator on record is Lon Pin Solar Limited. The planning application was refused. The determining authority is Gwynedd, reference C23/0338/38/LL.…

Refused
Project stageRefused
  1. PlanningDec 2023 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2025-11-10.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.990 MW
Registered Capacity

πŸ“‹ Project Overview

Land off Lon Pin, Llanbedrog - Solar Farm is a 4.99 MW solar farm project in Wales. The applicant or operator on record is Lon Pin Solar Limited. The planning application was refused. The determining authority is Gwynedd, reference C23/0338/38/LL.

Site Schematic

SUBSTATION ? ha Β· 4.99 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.990 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLon Pin Solar Limited
Owner / operatorLon Pin Solar Limited
LocationAdj Lon Pin, Llanbedrog, Pwllheli, Gwynedd, LL53 7PH
RegionWales
Coordinates52.8719974Β°N, 4.4928369Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)131500

πŸ“… Project Timeline

2023-12-22