Solar Farm

Land North West of Magor Service Station

Land North West of, Magor Service Statiorea INR, Magor, Caldicot, Gwent, Monmouthshire, NP26 3YL

Land North West of Magor Service Station is a 5 MW solar farm project in Wales. The applicant or operator on record is INRG Solar. The application has been withdrawn or the scheme abandoned. The determining authority is Monmouthshire, reference DC/2015/00573.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMay 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-12-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Land North West of Magor Service Station is a 5 MW solar farm project in Wales. The applicant or operator on record is INRG Solar. The application has been withdrawn or the scheme abandoned. The determining authority is Monmouthshire, reference DC/2015/00573.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperINRG Solar
Owner / operatorINRG Solar
Year consented2015
LocationLand North West of, Magor Service Statiorea INR, Magor, Caldicot, Gwent, Monmouthshire, NP26 3YL
RegionWales
Coordinates51.5876726Β°N, 2.8362278Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround

πŸ“… Project Timeline

2015-05-11
2015-12-14