Land near Manston is a 8.1 MW solar farm project in South East. The applicant or operator on record is Solar Planning. The planning application was refused. The determining authority is Thanet, reference F/TH/14/0645.β¦
Refused
Project stageRefused
PlanningJul 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2014-11-06.
Registered planning capacity; not measured generation.
Land near Manston is a 8.1 MW solar farm project in South East. The applicant or operator on record is Solar Planning. The planning application was refused. The determining authority is Thanet, reference F/TH/14/0645.