Land At Wood Road, Harrold, Bedford, Bedfordshire,, Norfolk, MK43 7BS
Land at Wood Road is a 5 MW solar farm project in Eastern. The applicant or operator on record is Town Farm Solar Farm. The planning application was refused. The determining authority is Bedford, reference 15/00444/MAF.β¦
Refused
Project stageRefused
PlanningMar 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-08-05.
Registered planning capacity; not measured generation.
Land at Wood Road is a 5 MW solar farm project in Eastern. The applicant or operator on record is Town Farm Solar Farm. The planning application was refused. The determining authority is Bedford, reference 15/00444/MAF.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Town Farm Solar Farm
Owner / operator
Town Farm Solar Farm
Location
Land At Wood Road, Harrold, Bedford, Bedfordshire,, Norfolk, MK43 7BS