Solar Farm

Land at Wittering Ford Road

Land to the South of Wittering Ford Road, Barnack, Stamford, Cambridgeshire, PE9 3HX

Land at Wittering Ford Road is a 3.9 MW solar farm project in Eastern. The applicant or operator on record is Lark Energy. The planning permission has expired. The determining authority is Peterborough, reference 14/02183/FUL.…

Expired
Project stageConsent lapsed
  1. PlanningJan 2015 (completed)
  2. ConsentedJan 2016 (completed)
  3. Consent lapsed (project stopped here)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Expired.

Official register: July 2026

Recorded status: Planning Permission Expired. Source record updated 2020-04-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.900 MW
Registered Capacity

πŸ“‹ Project Overview

Land at Wittering Ford Road is a 3.9 MW solar farm project in Eastern. The applicant or operator on record is Lark Energy. The planning permission has expired. The determining authority is Peterborough, reference 14/02183/FUL.

Site Schematic

SUBSTATION ? ha Β· 3.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)3.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLark Energy
Owner / operatorLark Energy
Year consented2016
LocationLand to the South of Wittering Ford Road, Barnack, Stamford, Cambridgeshire, PE9 3HX
RegionEastern
Coordinates52.6142931Β°N, 0.4330068Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID7631
Mounting Type for SolarGround
Solar Site Area (sqm)83900

πŸ“… Project Timeline

2015-01-02
2016-01-29