Land At Southland Farm, Bridgerule, Holsworthy, Devon, EX22 6LL
Land At Southland Farm (NOR) is a 5 MW solar farm project in South West. The applicant or operator on record is Lightsource Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Torridge, reference 1/0756/2015/FULM.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2015 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedApr 2016 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2019-03-01.
Registered planning capacity; not measured generation.
Land At Southland Farm (NOR) is a 5 MW solar farm project in South West. The applicant or operator on record is Lightsource Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Torridge, reference 1/0756/2015/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lightsource Renewable Energy
Owner / operator
Lightsource Renewable Energy
Year consented
2016
Location