Land at, Skelton Radio Transmitter Site, Skelton, Penrith, Cumbria, North West, Cumbria, CA11 9SY
Land at Skelton Radio Transmitter Site is a 5 MW solar farm project in North West. The applicant or operator on record is New Energy for the World. The application has been withdrawn or the scheme abandoned. The determining authority is Westmorland and Furness, reference 15/0907.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningOct 2015 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2017-05-02.
Registered planning capacity; not measured generation.
Land at Skelton Radio Transmitter Site is a 5 MW solar farm project in North West. The applicant or operator on record is New Energy for the World. The application has been withdrawn or the scheme abandoned. The determining authority is Westmorland and Furness, reference 15/0907.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
New Energy for the World
Owner / operator
New Energy for the World
Location
Land at, Skelton Radio Transmitter Site, Skelton, Penrith, Cumbria, North West, Cumbria, CA11 9SY