π Project Overview
Land At Rymes Farm (Phase 2)/Grange Solar Farm is a 6.8 MW solar farm project in South West. The applicant or operator on record is Solar Century (TGC Renewables). It is recorded as operational since November 2015. The determining authority is Forest of Dean, reference P1976/14/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 7 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Solar Century (TGC Renewables) |
| Owner / operator | Solar Century (TGC Renewables) |
| Year consented | 2015 |
| Construction started | 2015 |
| Commissioned / target | 2015 |
| Location | Land At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF |
| Region | South West |
| Coordinates | 51.9199863Β°N, 2.3737242Β°W |