πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Land At Rymes Farm (Phase 2)/Grange Solar Farm

Land At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF

Land At Rymes Farm (Phase 2)/Grange Solar Farm is a 6.8 MW solar farm project in South West. The applicant or operator on record is Solar Century (TGC Renewables). It is recorded as operational since November 2015. The determining authority is Forest of Dean, reference P1976/14/F…

Operational Β· Since 2015
7 MW
Installed Capacity
2015
Commissioned

πŸ“‹ Project Overview

Land At Rymes Farm (Phase 2)/Grange Solar Farm is a 6.8 MW solar farm project in South West. The applicant or operator on record is Solar Century (TGC Renewables). It is recorded as operational since November 2015. The determining authority is Forest of Dean, reference P1976/14/FUL.

Site Schematic

SUBSTATION ? ha Β· 6.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)7 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSolar Century (TGC Renewables)
Owner / operatorSolar Century (TGC Renewables)
Year consented2015
Construction started2015
Commissioned / target2015
LocationLand At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF
RegionSouth West
Coordinates51.9199863Β°N, 2.3737242Β°W

πŸ“… Project Timeline