Solar Farm

Land At Rymes Farm (Phase 2)/Grange Solar Farm

Land At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF

Land At Rymes Farm (Phase 2)/Grange Solar Farm is a 6.8 MW solar farm project in South West. The applicant or operator on record is Solar Century (TGC Renewables). It is recorded as operational since November 2015. The determining authority is Forest of Dean, reference P1976/14/F…

Operational Β· Since 2015
Project stageOperating
  1. PlanningDec 2014 (completed)
  2. ConsentedJun 2015 (completed)
  3. ConstructionAug 2015 (completed)
  4. OperatingNov 2015 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2016-09-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.800 MW
Registered Capacity
2015
Commissioned

πŸ“‹ Project Overview

Land At Rymes Farm (Phase 2)/Grange Solar Farm is a 6.8 MW solar farm project in South West. The applicant or operator on record is Solar Century (TGC Renewables). It is recorded as operational since November 2015. The determining authority is Forest of Dean, reference P1976/14/FUL.

Site Schematic

SUBSTATION ? ha Β· 6.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)6.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSolar Century (TGC Renewables)
Owner / operatorSolar Century (TGC Renewables)
Year consented2015
Construction started2015
Commissioned / target2015
LocationLand At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF
RegionSouth West
Coordinates51.9199863Β°N, 2.3737241Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)138000

πŸ“… Project Timeline

2014-12-23
2015-06-12
2015-08-15
2015-11-15