Land At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF
Land At Rymes Farm (Phase 2)/Grange Solar Farm is a 6.8 MW solar farm project in South West. The applicant or operator on record is Solar Century (TGC Renewables). It is recorded as operational since November 2015. The determining authority is Forest of Dean, reference P1976/14/Fβ¦
OperationalΒ· Since 2015
Project stageOperating
PlanningDec 2014 (completed)
ConsentedJun 2015 (completed)
ConstructionAug 2015 (completed)
OperatingNov 2015 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2016-09-20.
Registered planning capacity; not measured generation.
Land At Rymes Farm (Phase 2)/Grange Solar Farm is a 6.8 MW solar farm project in South West. The applicant or operator on record is Solar Century (TGC Renewables). It is recorded as operational since November 2015. The determining authority is Forest of Dean, reference P1976/14/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Solar Century (TGC Renewables)
Owner / operator
Solar Century (TGC Renewables)
Year consented
2015
Construction started
2015
Commissioned / target
2015
Location
Land At Rymes Farm, Malswick, Newent, Gloucestershire, Gloucestershire, GL18 1HF