Land at Rectory Farm is a 8.9 MW solar farm project in West Midlands. The applicant or operator on record is Green Switch Solutions. The application has been withdrawn or the scheme abandoned. The determining authority is Wychavon, reference 14/02267.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2015-02-09.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.900 MW
Registered Capacity

πŸ“‹ Project Overview

Land at Rectory Farm is a 8.9 MW solar farm project in West Midlands. The applicant or operator on record is Green Switch Solutions. The application has been withdrawn or the scheme abandoned. The determining authority is Wychavon, reference 14/02267.

Site Schematic

SUBSTATION ? ha Β· 8.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)8.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Switch Solutions
Owner / operatorGreen Switch Solutions
LocationRectory Farm, Rectory Lane, Upton Warren, Bromsgrove, Hereford and Worcester, B61 7EL
RegionWest Midlands
Coordinates52.3113932Β°N, 2.0980262Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)191800

πŸ“… Project Timeline

2014-09-08