Solar Farm

Land at Radbrook Pastures

Land To The West Of, Admington, Adjacent To Preston Bushes, Preston on Stour, Stratford-On-Avon, Warwickshire, CV37 8

Land at Radbrook Pastures is a 20.7 MW solar farm project in West Midlands. The applicant or operator on record is TGC Renewables/NESF. The planning permission has expired. The determining authority is Stratford-on-Avon, reference 15/00588/FUL.…

Expired
Project stageConsent lapsed
  1. PlanningApr 2015 (completed)
  2. ConsentedAug 2017 (completed)
  3. Consent lapsed (project stopped here)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Expired.

Official register: July 2026

Recorded status: Planning Permission Expired. Source record updated 2020-09-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

20.700 MW
Registered Capacity

πŸ“‹ Project Overview

Land at Radbrook Pastures is a 20.7 MW solar farm project in West Midlands. The applicant or operator on record is TGC Renewables/NESF. The planning permission has expired. The determining authority is Stratford-on-Avon, reference 15/00588/FUL.

Site Schematic

SUBSTATION ? ha Β· 20.7 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)20.700 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTGC Renewables/NESF
Owner / operatorTGC Renewables/NESF
Year consented2017
LocationLand To The West Of, Admington, Adjacent To Preston Bushes, Preston on Stour, Stratford-On-Avon, Warwickshire, CV37 8
RegionWest Midlands
Coordinates52.1280293Β°N, 1.715248Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)397000

πŸ“… Project Timeline

2015-04-27
2017-08-10