Land at Moss Farm, Moss Lane, Warmingham, Crewe, Cheshire, CW1 4PW
Land at Moss Farm (South) is a 5 MW solar farm project in North West. The applicant or operator on record is TGC Renewables/NESF. The planning permission has expired. The determining authority is Cheshire East, reference 15/2126N.β¦
Expired
Project stageConsent lapsed
PlanningMay 2015 (completed)
ConsentedMay 2016 (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2020-09-03.
Registered planning capacity; not measured generation.
Land at Moss Farm (South) is a 5 MW solar farm project in North West. The applicant or operator on record is TGC Renewables/NESF. The planning permission has expired. The determining authority is Cheshire East, reference 15/2126N.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
TGC Renewables/NESF
Owner / operator
TGC Renewables/NESF
Year consented
2016
Location
Land at Moss Farm, Moss Lane, Warmingham, Crewe, Cheshire, CW1 4PW