Land at, Lyons Way, Broadwater, Worthing, West Sussex, BN14 9
Land at Lyons Way is a 3.8 MW solar farm project in South East. The applicant or operator on record is BNRG (BL Solar 1). The planning application was refused. The determining authority is Worthing, reference SDNP/15/03672/FUL.β¦
Refused
Project stageRefused
PlanningAug 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2017-04-24.
Registered planning capacity; not measured generation.
Land at Lyons Way is a 3.8 MW solar farm project in South East. The applicant or operator on record is BNRG (BL Solar 1). The planning application was refused. The determining authority is Worthing, reference SDNP/15/03672/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
3.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
BNRG (BL Solar 1)
Owner / operator
BNRG (BL Solar 1)
Location
Land at, Lyons Way, Broadwater, Worthing, West Sussex, BN14 9