Land at Lostock Works (Northwich Facility)

Land At Lostock Works, Works Lane, Northwich, Cheshire

Land at Lostock Works (Northwich Facility) is a 5 MW renewable energy project in North West. The applicant or operator on record is Orsted (formerly Dong Energy). It is recorded as operational since October 2016. The determining authority is Cheshire West and Chester, reference 1…

Operational Β· Since 2016
5 MW
Installed Capacity
2016
Commissioned

πŸ“‹ Project Overview

Land at Lostock Works (Northwich Facility) is a 5 MW renewable energy project in North West. The applicant or operator on record is Orsted (formerly Dong Energy). It is recorded as operational since October 2016. The determining authority is Cheshire West and Chester, reference 15/04133/FUL.

πŸ”§ Technical Specifications

Capacity (MW)5 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperOrsted (formerly Dong Energy)
Owner / operatorOrsted (formerly Dong Energy)
Year consented2016
Construction started2016
Commissioned / target2016
LocationLand At Lostock Works, Works Lane, Northwich, Cheshire
RegionNorth West
Coordinates53.2638283Β°N, 2.4824022Β°W

πŸ“… Project Timeline