Land at Lane Head, Northwest o, Beckside, Cartmel, Grange Over Sands, Cumbria, LA11
Land at Lane Head is a 5 MW solar farm project in North West. The applicant or operator on record is Omicron Solar. The planning application was refused. The determining authority is Westmorland and Furness, reference SL/2015/0693.β¦
Refused
Project stageRefused
PlanningJul 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-11-05.
Registered planning capacity; not measured generation.
Land at Lane Head is a 5 MW solar farm project in North West. The applicant or operator on record is Omicron Solar. The planning application was refused. The determining authority is Westmorland and Furness, reference SL/2015/0693.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Omicron Solar
Owner / operator
Omicron Solar
Location