πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Land at Keihill

Site At Keilhill, King Edward, Banff, Grampian, Aberdeenshire, AB45 3LT

Land at Keihill is a 3 MW bioenergy / waste project in Scotland. The applicant or operator on record is Keil Green Energy. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2017/1357.…

Refused
Project stageRefused
  1. PlanningOct 2017 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2019-04-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.000 MW
Registered Capacity

πŸ“‹ Project Overview

Land at Keihill is a 3 MW bioenergy / waste project in Scotland. The applicant or operator on record is Keil Green Energy. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2017/1357.

πŸ”§ Technical Specifications

Capacity (MW)3.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperKeil Green Energy
Owner / operatorKeil Green Energy
LocationSite At Keilhill, King Edward, Banff, Grampian, Aberdeenshire, AB45 3LT
RegionScotland
Coordinates57.6270866Β°N, 2.4843481Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2017-10-16