Land at Havering Grove Farm, 552A Rayleigh Road, Hutton, Essex, CM13 1SG
Land at Havering Grove Farm is a 5 MW solar farm project in Eastern. The applicant or operator on record is Lightsource Renewable Energy. The planning application was refused. The determining authority is Brentwood, reference 15/00161/FUL.β¦
Refused
Project stageRefused
PlanningFeb 2015 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2016-05-30.
Registered planning capacity; not measured generation.
Land at Havering Grove Farm is a 5 MW solar farm project in Eastern. The applicant or operator on record is Lightsource Renewable Energy. The planning application was refused. The determining authority is Brentwood, reference 15/00161/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lightsource Renewable Energy
Owner / operator
Lightsource Renewable Energy
Location
Land at Havering Grove Farm, 552A Rayleigh Road, Hutton, Essex, CM13 1SG