πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Land at Flimby Hall Farm

Flimby, Maryport,, Cumbria

Land at Flimby Hall Farm is a 9.5 MW onshore wind project in North West. The applicant or operator on record is Flimby Wind Energy Ltd. The scheme is currently in the planning system, submitted December 2007. The determining authority is Cumberland, reference 2/2007/1255.…

Revised
Project stageSuperseded by a new application
  1. PlanningDec 2007 (completed)
  2. Superseded by a new application (project stopped here)
  3. ConsentedOct 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2011-06-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.500 MW
Registered Capacity

πŸ“‹ Project Overview

Land at Flimby Hall Farm is a 9.5 MW onshore wind project in North West. The applicant or operator on record is Flimby Wind Energy Ltd. The scheme is currently in the planning system, submitted December 2007. The determining authority is Cumberland, reference 2/2007/1255.

Site Schematic

NORTH WEST Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)9.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFlimby Wind Energy Ltd
Owner / operatorFlimby Wind Energy Ltd
Year consented2008
LocationFlimby, Maryport,, Cumbria
RegionNorth West
Coordinates54.6870739Β°N, 3.5139714Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)3.16
No. of Turbines3
Are they re-applying (New REPD Ref)3972

πŸ“… Project Timeline

2007-12-05
2008-10-14